Case Study

Data Locator Group

Location

Watford, Herts

Size

650 sqm

Duration

10 weeks

Value

£354,000

The Challenge

DLG decided that they wanted the high profile ground floor, street facing space, following the previous client deciding to move away.

Prodjex were asked to tender for the work and provided the design and specification on which all tenders would base their submission.

Prodjex won the work against fierce competition, not least from the landlord's own contractor, who had just recently refurbished the building.

Case Study: DLG Watford
Case Study: DLG Watford

Project Synopsis

It was Prodjex's great design, value for money and clear interpretation of the client's requirements, consequently showcased in both their presentation and costings proposal, that secured a contract in probably the best office space in Watford.

As the space was originally designed for 52 people - 10 metres squared per person - it meant that the installation of additional services were required to meet the client's occupancy level of 80 people.

Prodjex were intensely involved in designing new mechanical and electrical installations to provide cooling, fresh air ventilation and power above that provided for the space by the base build.

  • Metal sockets installed with feeds in Copex cable, connected to the under floor Electrak busbar system, through grommets in the raised access floor to new desk positions
  • Metal data boxes installed with Cat6 data cabling shrouded in Copex cable, through grommets in the raised access floor to new desk positions
  • Installation of some 'free issue' floor boxes incorporating double power sockets and double Cat6 data points
  • Moving of existing ceiling lighting to suit the new space plan
  • Installation of CCF Sektor 25 full height architectural glass walling with full height frameless glass doors incorporating stainless steel patch fittings and 'hold open' floor boxes to form fronts of Meeting Rooms, Board Room and CEO office
  • Installation of CCF Sektor 85 solid partition to form Server Room, Stationery Store, Tea Point & dividing walls of Meeting Room & Boardroom
  • All solid plasterboard partitions taped & jointed and then Decorated in a mist coat and two top coats Diamond Emulsion
  • All core walls decorated in Dulux Diamond emulsion
  • Installation of additional stand alone split pack air conditioning unit, to the Boardroom, to meet the additional cooling required above that provided by the base build
  • Installation of 2 no Lessnoy fresh air ventilation systems to meet the fresh air requirements above that provided by the base build
  • Installation of 2 no stand alone split pack air conditioning systems for the Server Room
  • Installation of Howdens high white gloss kitchen units coupled with 38mm laminated Granite style work tops with single post formed front edge
  • Tea Point installation included integrated tower fridge and 2 no integrated dish washers
  • Installation of Sanivite stand alone waste water pump
  • Installation of Hydroboil tap for providing boiling water for staff hot drinks and cold fresh filtered water
  • Installation of new CFS carpet tiling, Camaro vinyl plank flooring and Polysafe sheet vinyl flooring all separated via Gradus clip top delineation strips
  • Installation of full height storage wall in white laminate finish
  • Installation of some ceiling hung, and some wall hung, TV brackets and TV's all of which were connected via data cables to the Server Room and some of which have HDMI connectivity
  • Installation of new desking and Break Out furniture